Competent Person and Retained Support
Our monthly packages give you a competent person when you have no one in-house.
Whether you are having building work done or carrying it out, the Construction (Design and Management) Regulations 2015 give you health and safety duties, and we help you meet them.


We help you put the right arrangements in place before work starts, and keep them working once it is under way.
We have the appropriate CSCS cards relevant to our role.
You receive written advice on what your project needs, with the actions to take.
If you need CDM health and safety support, please contact us using the form below.
We ask what is being built or changed, who is designing and building it, and when work starts.
Drawings, the programme and any surveys of the building help us see the risks early.
We go through the plans and information for the project and, where needed, visit the site.
Put the changes in place and keep our advice with the project documents.
CDM applies to all construction work in Great Britain, whatever its size, from a shop refit or an extension to a new building. If the work is done for a business or another organisation, such as a landlord, a charity or a school, that business or organisation is the client and has client duties. For work on your own home or a family member's home, your client duties normally pass to your builder.
You must make suitable arrangements for managing the project, with enough time and resources. As soon as practicable, give every designer and contractor you appoint, or are thinking of appointing, the information about the site, the building and its risks that you hold or can reasonably obtain. You must also make sure a construction phase plan is drawn up before work starts and, where there is a principal designer, that a health and safety file is prepared and kept available.
Under CDM, when more than one contractor will work on the project, the client must appoint both in writing, as soon as practicable and before construction work starts. The principal designer must be a designer with control over the pre-construction phase. A business that does not appoint them must carry out their duties itself. On work on your own home, if you do not appoint them, the designer in control of the design stage becomes the principal designer and the contractor in control of the building work becomes the principal contractor.
The Building Regulations in England have their own principal designer and principal contractor roles, which deal with meeting the Building Regulations rather than health and safety. You can confirm in writing that your CDM principal designer and principal contractor also hold these roles.
Yes, if the construction work is scheduled to last more than 30 working days and have more than 20 workers working at the same time at any point, or to exceed 500 person days. The client sends the notice to HSE as soon as practicable before construction work starts. On work on your own home, the contractor, or the principal contractor if there is more than one, normally sends it instead.
It depends on the size of the project, how long it runs and how many site visits you need.
Tell us about your project and when work starts, and we will send a guide price for CDM health and safety support.